From prototype to mass production: steps, timing and risks

A prototype that works on your desk is not yet a product you can build by the thousand. These are the stages in between and what to check at each one.

Short answer: move from prototype to production in stages: lock down the design, build engineering samples, run a small pilot batch on the real production line, then scale up. Each stage should end with test results you can review before you commit money to the next one.

Why a working prototype is not enough

Early prototypes are often hand-built, use parts that are hard to buy in volume, and have never been tested beyond a few units. Common problems only show up later:

The stages

1. Lock down the design

Fix the requirements, the circuit and the parts list. Replace parts that are hard to source with ones you can buy in volume. Decide how each board will be tested in production.

2. Engineering samples

Build a small number of boards from the production-ready files and test them against the requirements. With us, samples and small batches typically take 14-21 days from complete files.

3. Pilot run

Build a small batch on the same SMT line that will run mass production. This shows whether the design is easy to assemble and test, and gives you real yield data before you order volume.

4. Mass production

Scale up with the test steps and records agreed during the pilot. Our 3 in-house Siemens SMT lines handle up to 10 million placements a month.

Mistakes that cause delays

What to send us to get started

Tell us what the product does, how it is powered, the target retail price and your expected yearly volume. If you have them, add the schematic, PCB files, BOM and photos of the prototype. There is no minimum order: you can start from 1 board.

Tell us about your product

Send a short description and an engineer replies within 1 business day after we confirm we have your request. Orders from 1 board.

Send your inquiry →