Short answer: for a small appliance, settle four things early: how the product is powered, what the user controls, what must be measured (such as temperature), and the target cost per unit. Then design the control board around parts you can buy in volume, prove it with samples, and run a pilot batch before mass production.
Decisions to make early
- Power. Mains-powered, battery or USB. This shapes the whole design and the safety work.
- User controls and display. Buttons, touch keys, a dial, LEDs or a screen.
- Sensing. What the product needs to measure, and how accurately.
- Connectivity. Whether the product needs an app or works on its own. Adding wireless adds cost and testing.
- Target cost. The retail price you are aiming for sets the budget for the electronics.
- Certifications. Confirm which certifications your target markets require before the design is locked down, because they can affect the design.
Project example: pour-over coffee kettle
A pour-over coffee kettle brand worked with us on both product development and production. The project covered development with our engineering team and production in our Dongguan factory. We don't name our clients.
How a small appliance project runs with us
- We agree the requirements, target cost and volumes with you.
- Our engineers design the control electronics and PCB.
- We build samples, typically in 14-21 days from complete files, so you can test them in the product.
- A pilot batch runs on our in-house Siemens SMT lines.
- Mass production follows, with up to 10,000 boards a day of capacity.
You can start with a single board. There is no minimum order quantity.
Tell us about your product
Send a short description and an engineer replies within 1 business day after we confirm we have your request. Orders from 1 board.
Send your inquiry →